IDA1: Gate Closure Time for market parties at D-1 15h. Allocated period D

0h-24h

 

IDA2: Gate Closure Time for market parties at D-1 22h. Allocated period D

0h-24h

 

IDA3: Gate Closure Time for market parties at D 10h. Allocated period D

12h-24h





How Does the Algorithm Work?

EUPHEMIA, i.e. the algorithm developed for SDAC, is used for the purpose of IDAs. The public description of EUPHEMIA (applicable to IDA and to SDAC) is available in the following link: https://www.nemo-committee.eu/assets/files/euphemia-public-description.pdf  


High-Level Architecture

  • XBID is used as source of network constraints data for IDA (pre-coupling) and to validate the IDA results in terms of capacity meeting the network constraints (coupling).
  • Network data are provided via NEMOs to EUPHEMIA (auction algorithm).
  • IDA results are submitted to XBID to update the information about Already Allocated Capacity (AAC) in XBID and to reflect in relevant CMM files the existence of capacity reserved for IDA results.
  • IDAs Trading Solution is the same solution as used for day-ahead being adapted for IDAs, depending on each NEMO.
  • IDA CIP is an intermediate system (interface) between XBID and NEMO Systems.


Products & Order Types

IDAs solution supports hourly, half-hourly and quarter-hourly products.

However, for the time being simple orders of only one time resolution are allowed in each BZ.

The products supported by the SIDC IDAs and SDAC algorithms are equivalent; it is the responsibility of each NEMO to decide whether or not to propose optional products. Additional order types  supported include simple block orders, complex block orders, and merit orders.



Information Notes

2026

2025

10 December 2025: SIDC OPSCOM Report on Automatic Partial Decoupling with Regard to the Intraday Auction (IDA1) for Delivery Date 14th November 2025

29 October 2025: SIDC OPSCOM Report on Automatic Partial Decoupling with Regard to the Intraday Auction (IDA1) for Delivery Date 15th October 2025

20 October 2025: SIDC OPSCOM: Report on Automatic Partial Decoupling with Regard to the Intraday Auction (IDA3) for Delivery Date 18th September 2025

26 September: SIDC OPSCOM: Report on Automatic Partial Decoupling with Regards to the Intraday Auction (IDA3) for Delivery Date 9th September 2025

27 August: SIDC OPSCOM: Report on Automatic Partial Decoupling with Regards to the Intraday Auction (IDA1) for Delivery Date 25th July 2025

27 August: SIDC OPSCOM: Report on Cancellation of Intraday Auction 2 for Delivery Date 16th July 2025

27 August: SIDC OPSCOM: Report on Automatic Partial Decoupling with Regards to the Intraday Auction (IDA1) for Delivery Date 16th July 2025

27 August: SIDC OPSCOM: Report on Automatic Partial Decoupling With Regards to the Intraday Auction (IDA1) for Delivery Date 13th July 2025

13 August: SIDC OPSCOM Report on Automatic Partial Decoupling with Regards to the Intraday Auction 1 for Delivery Date 4 July 2025

6 August: Successful Integration of Bursa Română de Mărfuri (BRM) into Single Intraday Auction 2nd Go-Live Wave

23 June: SIDC OPSCOM Report on Cancellation with Regards to the Intraday Auction 1 for Delivery Date 3 June 2025

10 June: SIDC OPSCOM Report on Cancellation with Regards to the Intraday Auction 2 for Delivery Date 17 May 2025

16 May: SIDC OPSCOM Report on Automatic Partial Decoupling with Regards to the Intraday Auction (IDA2) for Delivery Date 3 May 2025

12 May: SIDC OPSCOM Report on Cancellation with Regards to the Intraday Auction 1 for Delivery Date 20 April 2025

19 March: SIDC Nears 15-Minute Market Time Unit (MTU) Completion // Activation of Romanian Borders in Intraday Auctions

21 February: SIDC OPSCOM Report on Cancellation with Regards to the Intraday Auction (IDA2) for Delivery Date 4 February 2025

13 February: SIDC OPSCOM Report on Automatic Partial Decoupling with Regards to the Intraday Auction (IDA1) for Delivery Date 1 February 2025

5 February: SIDC OPSCOM Report: Cancellation of Intraday Auction (IDA3) for Delivery Date 22 January 2025

5 February: SIDC OPSCOM Report on Automatic Partial Decoupling with Regards to the Intraday Auction (IDA3) for Delivery Date 17 January 2025

23 January: SIDC Announces the Launch of 15-Minute Products in Several Bidding Zones and Interconnectors


2024

​​​​​​​
Resources Available

IDA weekly reports 2026

IDA weekly reports 2025​​​​​​​​​​​​​​

IDA weekly reports 2024

IDA NEMO Procedures

Normal procedures

IDA NEMO NOR 06 Configuration Synchronization

IDA NEMO NOR 07 Send IDA network data to PMB and Cross-check IDA network data

IDA NEMO NOR 08 Aggregate order books and send to PMB

IDA NEMO NOR 09 Calculating IDA results

IDA NEMO NOR 10 Results Sharing and Receiving

IDA NEMO NOR 12 Preliminary Confirmation of the Results

IDA NEMO NOR 14 Perform MP check on IDA results

IDA NEMO NOR 17 Final Confirmation from NEMO to PMB and Global Final Confirmation to IDA CIP tool

IDA NEMO NOR 24 IDA Report and session dumps 


Operational and other procedures

                   IDA NEMO OPE 01 IDA Coordinator Switch

IDA NEMO OPE 03 SCF Distribution and Activation

IDA NEMO OPE 06 Exchanging files in back-up mode

IDA NEMO OPE 07 PMB and IDA CIP Deployment management


IDA NEMO OTH 01 IDA Calls

IDA NEMO OTH 05 MPLS Incident Management


Back-up procedures

IDA NEMO BUP 06 Configuration Synchronization

IDA NEMO BUP 07 Send IDA network data to PMB and cross-check IDA network data

IDA NEMO BUP 08 Aggregate order books and send to PMB

IDA NEMO BUP 09 Calculating IDA results

IDA NEMO BUP 10 Results Sharing and Receiving

IDA NEMO BUP 12 Preliminary Confirmation of the Results​​​​​​​​​​​​​​

IDA NEMO BUP 14 Perform MP check on IDA results

IDA NEMO BUP 17 Final Confirmation from NEMO to PMB and back to IDA CIP tool

IDA NEMO BUP 24 IDA report and session dump




Exceptional and fallback procedures

IDA NEMO EXC 01 Abort and Restart of the MC session

IDA NEMO EXC 02 Partial Decoupling

IDA NEMO EXC 03 Disaster Recovery Site

IDA NEMO EXC 04 Connection Issues

​​​​​​​

IDA NEMO FAL 02 PMB Incident management

IDA NEMO FAL 03 Algorithm Incident Management